Organization and Tasks FAM

Organizational chart FAM

You can view the detailed distribution of FAM's tasks and functions here (PDF, German).

Areas of responsibility FAM

You can view the basic allocation of FAM's tasks and activities here (PDF, German).

For further information, please refer to the business distribution plans of GSI.


Areas of responsibility BAU


Civil Construction Project Management

Civil Construction Building Maintenance

Areas of responsibility CAM

Areas of responsibility GAT

  • Electrical Engineering Buildings (GET)
    • Electrical Engineering Operation (ETB)
      • Operational organization, workshop
      • On-call duty
      • Apprenticeships
      • Emergency stop Force-confirmed doors/gates, roller doors, turnstiles, barriers
      • Elevators, crane systems
      • UPS/backup power systems
      • Lightning protection systems, NSHV
    • Electrical Engineering Coordination (ETK)
      • Work preparation
      • Technical planning
      • Project coordination and management
    • Electrical Engineering Medium Voltage (ETM)
      • Operational Safety regulations
      • Planning and conversion of medium-voltage systems
      • Switching operations
    • Electrical Engineering Test (ETP)
      • DGUV-V3 inspections
      • Thermography of electrical systems
         
  • Building Process Automation (GPA)
    • Process Automation Operation (PAB)
      • Operational organization
      • Workshop
      • On-call duty
    • Process Automation Planning (PAP)
      • Instrumentation and Control (I&C) systems
      • Building Management System (BMS)
      • Technical coordination of accelerator and research facilities
      • Energy controlling and optimization
    • Process Automation Systems (PAS)
      • Programmable Logic Controllers (PLC)
      • Profi-Net network technology
         
  • Building Safety Systems (GSA)
    • Safety Systems Fire Alarm Systems (SAB)
      • Fire alarm technology
      • Control system
      • Smoke aspiration system
    • Safety Systems Radio Systems (SAF)
      • Radio technology
      • BOS radio
      • Emergency call stations
    • Safety Systems Extinguishing Systems (SAL)
      • Fire extinguishing systems (nitrogen, high-pressure mist)
      • Control center
    • Safety Systems Emergency Lighting (SAN)
      • Safety lighting
      • Emergency lighting (SiBel)
         
  • Building Services (GVT)
    • Building Services Operation (VTB)
      • Operational organization
      • Workshop
      • On-call duty
      • Apprenticeships
    • Building Services Cooling (VTK)
      • Cooling
      • Refrigeration
      • Compressed air
      • Gases / gas systems
    • Building Services Ventilation (VTL)
      • Heating
      • Ventilation
      • Air conditioning
      • Smoke and heat extraction (SHE)
    • Building Services Water (VTW)
      • Water
      • Wastewater
      • Water treatment
         

Areas of responsibility ZDI

  • Caretaker services
  • Transport services / relocation
  • Event setup and coordination
  • Guidance and orientation systems
  • Vehicle fleet / mobility
  • Public transport coordination / parking management
  • Room allocation Seminar and event rooms
  • Used furniture
  • Reception / telephone switchboard / mail room
  • Plant security / plant security technology / perimeter protection
  • Outdoor facilities and grounds maintenance
  • Cleaning of buildings and traffic areas
  • Sanitary and hygiene equipment
  • Pest control
  • Canteen / cafeteria
  • Vending machines / water dispensers Water dispenser locations
  • Waste disposal / recycling center / data protection bins
    Organic waste, Organic waste bin locations, Document shredder locations, Shredder locations

ZDI overview plan (e.g. waste bins, water dispensers, bus stop, Call a bike, etc.)

Please note that some documents are currently only available in German.


Loading...