Scientific Report 2014 GSI Report 2015-1, 200-202 p. (2015) [10.15120/GR-2015-1-MU-NUSTAR-NR-12] "NeuLAND test-beam data analysis with R3BRoot framework", D. Kresan et al, Scientific Report 2014 GSI Report 2015-1 [...] 165701] The NeuLAND Technical Design Report, available here . "NeuLAND - from the demonstrator to the start version" , K. Boretzky et al, Scientific Report 2016 GSI Report 2017-1, 207-210 p. (2017) [10.15 [...] Scientific Report 2014 GSI Report 2015-1, 204-205 p. (2015) [10.15120/GR-2015-1-MU-NUSTAR-NR-14] "Multi-Neutron detection in R3B at FAIR with alternative detector model", V. Wagner et al, Scientific Report 2014
Cryostat Production", C. Mayri et al, GSI Scientific Report 2012, PHN-ENNA-EXP-59 "Status of the R3B GLAD Magnet Cryosystem", C. Betz et al, GSI Scientific Report 2012, PHN-ENNA-EXP-58 "R3B-Glad Magnet R&D Tests [...] magnet is leaving CEA Saclay. April 2015 On April 24 FAIR has approved the GLAD Technical Design Report. December 2014 The power-supplay and quench-anaysis systems of the GLAD magnet, see photos below [...] design & construction of the R3B-GLAD superconducting magnet", B. Gastineau et al, GSI Scientific report 2009, FAIR-EXPERIMENTS-17, p. 18. "Design Status of the R3B-GLAD Magnet: Large Acceptance Superconducting
, NM, USA Development of Multistage Pseudospark Switches I. Petzenhauser, K. Frank, U. Blell GSI-Report (2005) Haben Sie noch weiterführende Fragen oder Anmerkungen, so senden Sie bitte eine Email an
scientific reports D. Winters et al, GSI scientific report 2016 D. Winters et al, GSI scientific report 2015 D. Winters et al, GSI scientific report 2014 D. Winters et al, GSI scientific report 2012 T. Beck [...] scientific report 2012 M. Bussmann et al., GSI scientific report 2012 M. Bussmann et al., GSI scientific report 2011 M. Bussmann et al., GSI scientific report 2010 M. Bussmann et al., GSI scientific report 2009
EPAC 2008, MO204 Author: W. Barth The HITRAP Decelerator Project at GSI - Status and Commissioning Report LINAC 2008, MOP019 Authors: L. Dahl, W. Barth, P. Gerhard, F. Herfurth, M. Kaiser, O. Kester, H.
Groening, A. Orzhekhovskaya, U. Ratzinger, A. Seibel, R. Tiede, H. Vormann, C. Xiao UNILAC Status Report Authors: P. Gerhard, W. Barth, L. Groening, M. Maier, S. Mickat, U. Scheeler, H. Vormann, C. Xiao
study group report , Darmstadt 2012 Physics book: CRYRING@ESR , Eur. Phys. J. Spec. Top. (2016) 225:797 TDR: Experimental Instrumentation of CRYRING@ESR , Darmstadt 2016 GSI Annual report: 2021 , 2020 [...] Darmstadt, the ring was modernized and adapted to the GSI/FAIR standards and set up downstream of ESR ( Report ). CRYRING@ESR can store, cool and decelerate heavy, highly charged ions down to a few 100 keV/nucleon
Topics Status FAIR SPARC relevant facilities at FAIR: HESR, APPA cave, CRYRING, HITRAP Progress reports on instrumental development Day one experiments SPARC time line: TDRs, Funding, Meetings, etc. I