Vacuum Laboratory
To ensure the vacuum compatibility of all devices, which have to be mounted into the accelerator, a vacuum acceptance test is carried out before installation. The vacuum acceptance test involves a test of leak tightness, outgassing rate measurements, and residual gas analysis.
Pumping speed measurements, thin film depositions, and Electron-stimulated Desorption (ESD) are also performed in the vacuum laboratory.
Persons in Charge
Dr. Maria Cristina Bellachioma Dr.Phe Man Suherman
Telefon: 06159-71-1361 Telefon:06159-71-2135
Vacuum Lab Team
06159-71-1364 | |
06159-71-1367 | |
06159-71-1767 | |
06159-71-1411 |
For additional informations click here