Report Topics - Longitudinal Beam Dynamics and RF-Systems

 

Damping of Longitudinal Quadrupole Oscillations with BFS Prototype in SIS18

10.12.2023

 

Verification of SIS18 Bunch Compressor Cavity

25.11.2023

 

Spill Measurements with High RF Voltage

13.07.2022

 

Tune dependence of electrostatic extraction septum voltage

29.07.2022

 

Re-Commissioning of SIS18 Longitudinal Beam Phase Control

08.05.2022

 

SIS18 Beam Density Distribution

04.11.2021

 

Measurements of discharges at the Electrostatic Septum SIS18

03.09.2021

 

Machine Studies in SIS18

30.10.2020

 

Testing RF capture and debunching with longitudinal bunch profile measurements

06.12.2019

 

Conversation of longitudinal Phasespace

02/2019

 

Dual-Harmonic Operation of SIS18 RF Systems

21.02.2019

 

Recommissioning of SIS18 RF systems

10.08.2018

 

Dual Harmonic Acceleration with the MA and the Ferrite Cavity in SIS18

02.07.2016

 

8:4 Bunch Merging on Intermediate Flattop in SIS18

28.06.2016

 

Handover from Cavity BE4 to BE1 During Acceleration in SIS18

11.06.2016

 

Damping of Longitudinal Quadrupole Qscillations during acceleration in SIS18

12.12.2014

 

SIS18 H=4/8 Dual Harmonic Acceleration

04.11.2014

 

Bunch Merging and Subsequent Compression in SIS18

27.10.2014

 

Experiment with Single and Dual Harmonic Cavities

17.10.2014

 

Beam diagnostics DAQ development

11.09.2014

 

Dual-Harmonic Beam Phase Control in SIS18

20.05.2014

 

Investigations on the status of SIS18 on the beamtime of 24-25/03/2014

04.04.2014

 

Beam Diagnostic DAQ Development

23.11.2012

 

Dual-Harmonic Beam Phase Control in SIS18

21.11.2012

 

Verification of Phase and Amplitude Calibration

21.11.2012

 

Phase Calibration & Verification by 4:2:1 Bunch Merging in SIS18

30.03.-31.03.2012

 

Testing the Data Supply Control System with Bunch Merging in SIS18

16.08.2011

 

Bunch Merging in SIS18-Fully Controlled by the Central Control System

30.06.2011

 

Reduktion der Strahlimpedanz durch Fast Feedback im SIS18 (German)

20.04.2011

 

Beam Experiment Stationary Dual Harmonic Operation under High-Intensiy Conditions

13.12.2010

 

Oline Phase Space Tomography of fast compressed bunch using new fast current transformer signal

18.03.2010

 

Beam Experiment Dual Harmonic Operation with Acceleration

10.03.2010

 

Longitudinal momentum spread and micro bunch filamentation

23.10.2009

 

Dependence of the longitudinal beam distribution on multi-turn injection

04.08.2009

 

Beam Experiments Concerning Damping of Longitudinal Quadrupole Oscillations in SIS12/18

24.10.2007

 

First Beam Experiments Concerning Closed Loop Damping of Quadrupole Oscillations in SIS12/18

11.06.2007/28.08.2007

 

Machine Development Experiment Concerning Excitation and Open Loop Damping of Longitudinal Quadrupole Oscillations in SIS12/18

19.-20.12.200

 

Messungen zum 1-und 2-Kavitätenbetrieb: Gezielte Anregung von Quadrupolschwingungen (German)

16.-17.08.2006

 

Measurements and Analysis of the Transverse Beam Transfer Function (BTF) at the SIS18 Synchrotron

24.10.2006

 

Machine Development Experiments on Cavity Synchronization in the SIS12/18

07.-08.06.2005

 

HF-Gymnastik mit zwei Harmonischen (German)

18.-19.12.2002

 

Maschinenexperimente zur longitudinalen Emittanzentwicklung im SIS (German)

31.10.-01.11.2002

 

Maschinenexperimente zum Hochfrequenzeinfang im SIS (German)

13.-15.08.2002

 

Maschinenexperimente zum longitudinalen Strahlverhalten während des Hochfrequenzeinfangs (German)

05.-06.06.2002

 

 

 


 

If you have any further questions or remarks, please send an email to P. Schwab


Loading...