Bitte aktivieren Sie JavaScript für diese Seite!
The new accelerator facility FAIR is under construction at GSI. Learn more.
Damping of Longitudinal Quadrupole Oscillations with BFS Prototype in SIS18
10.12.2023
Verification of SIS18 Bunch Compressor Cavity
25.11.2023
Spill Measurements with High RF Voltage
13.07.2022
Tune dependence of electrostatic extraction septum voltage
29.07.2022
Re-Commissioning of SIS18 Longitudinal Beam Phase Control
08.05.2022
SIS18 Beam Density Distribution
04.11.2021
Measurements of discharges at the Electrostatic Septum SIS18
03.09.2021
Machine Studies in SIS18
30.10.2020
Testing RF capture and debunching with longitudinal bunch profile measurements
06.12.2019
Conversation of longitudinal Phasespace
02/2019
Dual-Harmonic Operation of SIS18 RF Systems
21.02.2019
Recommissioning of SIS18 RF systems
10.08.2018
Dual Harmonic Acceleration with the MA and the Ferrite Cavity in SIS18
02.07.2016
8:4 Bunch Merging on Intermediate Flattop in SIS18
28.06.2016
Handover from Cavity BE4 to BE1 During Acceleration in SIS18
11.06.2016
Damping of Longitudinal Quadrupole Qscillations during acceleration in SIS18
12.12.2014
SIS18 H=4/8 Dual Harmonic Acceleration
04.11.2014
Bunch Merging and Subsequent Compression in SIS18
27.10.2014
Experiment with Single and Dual Harmonic Cavities
17.10.2014
Beam diagnostics DAQ development
11.09.2014
Dual-Harmonic Beam Phase Control in SIS18
20.05.2014
Investigations on the status of SIS18 on the beamtime of 24-25/03/2014
04.04.2014
Beam Diagnostic DAQ Development
23.11.2012
21.11.2012
Verification of Phase and Amplitude Calibration
Phase Calibration & Verification by 4:2:1 Bunch Merging in SIS18
30.03.-31.03.2012
Testing the Data Supply Control System with Bunch Merging in SIS18
16.08.2011
Bunch Merging in SIS18-Fully Controlled by the Central Control System
30.06.2011
Reduktion der Strahlimpedanz durch Fast Feedback im SIS18 (German)
20.04.2011
Beam Experiment Stationary Dual Harmonic Operation under High-Intensiy Conditions
13.12.2010
Oline Phase Space Tomography of fast compressed bunch using new fast current transformer signal
18.03.2010
Beam Experiment Dual Harmonic Operation with Acceleration
10.03.2010
Longitudinal momentum spread and micro bunch filamentation
23.10.2009
Dependence of the longitudinal beam distribution on multi-turn injection
04.08.2009
Beam Experiments Concerning Damping of Longitudinal Quadrupole Oscillations in SIS12/18
24.10.2007
First Beam Experiments Concerning Closed Loop Damping of Quadrupole Oscillations in SIS12/18
11.06.2007/28.08.2007
Machine Development Experiment Concerning Excitation and Open Loop Damping of Longitudinal Quadrupole Oscillations in SIS12/18
19.-20.12.200
Messungen zum 1-und 2-Kavitätenbetrieb: Gezielte Anregung von Quadrupolschwingungen (German)
16.-17.08.2006
Measurements and Analysis of the Transverse Beam Transfer Function (BTF) at the SIS18 Synchrotron
24.10.2006
Machine Development Experiments on Cavity Synchronization in the SIS12/18
07.-08.06.2005
HF-Gymnastik mit zwei Harmonischen (German)
18.-19.12.2002
Maschinenexperimente zur longitudinalen Emittanzentwicklung im SIS (German)
31.10.-01.11.2002
Maschinenexperimente zum Hochfrequenzeinfang im SIS (German)
13.-15.08.2002
Maschinenexperimente zum longitudinalen Strahlverhalten während des Hochfrequenzeinfangs (German)
05.-06.06.2002
If you have any further questions or remarks, please send an email to P. Schwab
• SIS18 Upgrade for FAIR
• SIS18 Sections
• Beam Properties
• Technical Parameters
• Machine Setting, Control and Operating
• Working at SIS18
• SIS18 Photos and Videos
• Reports sorted by Topics
⇒ Back to overview Reports sorted by Topics