status of the FAIR project at this event. He informed about the upcoming installation phase for the SIS100 ring accelerator, emphasizing the crucial importance of the timely arrival of components, including
The workshop „Physics Opportunities with Proton Beams at SIS100” was held recently in Wuppertal. It was organized by the Helmholtz Research Academy Hesse for FAIR (HFHF), GSI/FAIR together with the Bergische [...] in the field of proton induced interactions, and explored possibilities for exciting physics at the SIS100 accelerator at FAIR. The overarching aim was to identify synergies among the various theoretical [...] matter. (CP) Further information Website of workshops „Physics Opportunities with Proton Beams at SIS100“
groundbreaking progress has been made for the large FAIR ring accelerator SIS 100: A section of the cryogenic part of the SIS100 was built at the STF series test facility on the GSI/FAIR campus and then [...] too much. Each individual unit was tested extensively by the manufacturers and approved by the SIS100/SIS18 sub-project at GSI/FAIR. Only the interconnection areas of the large superconducting modules [...] installation begins. The setup now realized at the STF corresponds to a continuous section of the SIS100 arc, consisting of two dipole modules and a one quadrupole module. Other important and technically
construction site. There, the guests saw the central crossing structure, the impressive size of the SIS100 particle accelerator and the buildings for the FAIR experiments. Furthermore, they had the opportunity
tivity and Sustainability" was the motto of a future-oriented workshop held jointly by the GSI SIS100/SIS18 department, headed by Dr. Peter Spiller, and the European superconducting industry association
2024.100362] Ondreka, D. ; Bozyk, L. ; Graeff, C. ; et al Slow extraction of a dual-isotope beam from SIS1 8 15th International Particle Accelerator Conference, IPAC2024, Nashville, USA, 19 May 2024 - 24 May
the individual construction sections. The program included the underground accelerator ring tunnel SIS100, the central beamline and transfer building, and the buildings for the experimental sites. (JL)
tracker of PANDA's Forward Detector, as well as for the cryogenic systems in the large accelerator ring SIS100 and in the Super Fragment Separator. The partnership with Jagiellonian University Krakow lasts since
better advanced than CBM, I would have joined these activities. But there is none. If FAIR can deliver SIS100 beams the CBM collaboration will be ready for data taking. And the CBM experiment has the high-rate [...] system for CBM have been built in China. They are tested and ready to be employed at FAIR. We need a SIS100 beam. TO: There is an existing strong interaction between the Japanese and GSI activities in nuclear [...] by RIKEN and GSI/FAIR where we jointly open research on neutron-rich hypernuclei. FAIR provides the SIS100 accelerator and the Super FRS, the equipment to produce such really exotic nuclei, and RIKEN develops