The stations of the Open House are mostly at ground level and therefore suitable for wheelchair users. Persons with walking difficulties need to plan for long walking distances ( more than 500 meters)
connection with other technical departments and experimental users. Adjusting and optimization of the beam cooling devises according to accelerator and user demands. The CR stochastic cooling system ( PSP 2.5.10)
HIC4FAIR 08 - 12 Member of the JCHP Management Board (FZ Jülich) 08 - 10 Chair of the Committee of FAIR users (CFU) 08 - 10 Research Coordinator FAIR JCT: Hadron physics/PANDA 07 - 12 Member of the Management
stellar explosions or in the core of planets. Employees of GSI and FAIR 1,580 employees Scientific users of the FAIR facility 3000 researchers from 50 countries. Investments 3.3 billion euros.
experiments of biophysics and materials research in order to fulfill the broad demands of a universal user-facility for the the MAT- and BIO- collaborations. The BIOMAT activities are integrated in experimental
DABC Documentation To current Documentation DABC v2 Archive: DABC User manual v1.01 Users' manual of Version 1 (2009) DABC Programmer and user manual v1.01 More detailed description of framework mechanisms
together, providing multithreaded multinode environment for that. Moreover, DABC prvides several kinds of user interfaces to monitor and control distributed applications. Since the FAIR Phase 0 beamtimes have