Publications and Reports Ring HV Injection- and Extraction Devices Concept and Design of the Injection Kicker System for the FAIR SIS100 Synchrotron I.J. Petzenhauser, U. Blell, P. Spiller, L.O. Baandrup [...] , NM, USA Development of Multistage Pseudospark Switches I. Petzenhauser, K. Frank, U. Blell GSI-Report (2005) If you have any further questions or remarks, please send an email to Webmaster@SIS100
Publications and Reports SIS100/SIS18 Publications and Reports SIS100/SIS18 Publications and Reports Ring HV Publications and Reports Ring RF Systems Publications and Reports System Design SIS100/SIS18 [...] 8 Publications and Reports SC Magnets & Testing Procurement Status FAIR Accelerator Diploma-and PhD-Theses Student Internship Reports
Report Topics - Injection-, Extraction- and Transverse Feed Back System Langsame Extraktion mit Hardt Bedingung – Transmissions-Optimierung 21.05.2007 TFS Experimente ( German ) 10.03.2005 Transversale
Report Topics - Machine Protection and Radiation Damage Irradiation of equipment in cave HHD during the B-block in March-April 2012 30.03./ 01.04.2012; Irradiation of materials in cave HHD during B-block
Report Topics - Longitudinal Beam Dynamics and RF-Systems Phase Calibration & Verification by 4:2:1 Bunch Merging in SIS18 30.03.-31.03.2012; Testing the Data Supply Control System with Bunch Merging in
Report Topics - Ionenoptics and Transverse Beam Dynamics Resonance Scan 04.11.2011 ; Strahlführung mit F0D0 Fokussierung ( German ) 30.06.2011 ; Anfangsverluste bei MTI unter Raumladungseinfluss ( German [...] for closed orbit correction 10.8.2009 ; TK-Kollimation und MTI-Effizienz ( German ) 07.08.2009 ; Report on the measurement of the SIS18 acceptance on August 5 th 05.08.2009 ; Linear Betatron Coupling in
Report Topics - Static and Dynamic Vacuum Lebensdauermessungen mit Ta 24+ ( German ) 27.06.2011 Lebensdauermessungen mit U 28+ ( German ) 18.10.2010 Lebensdauermessungen mit U 39+ ( German ) 30.-31.07
Report Topics - Beam Diagnostics Tune Messungen 20.06.2012 Scintillation Screen Investigations for FAIR Accelerators 18.05.2012 Determination of Tune Spread by digital Base-Band Position Acquisition 06
Report Topics - Machine Setting and Data Supply 4:2:1 Bunch Merging in SIS18 19.10.2010 Schneller Pulsbetrieb ( German ) 02.06.2002 If you have any further questions or remarks, please send an email to
Wed, Ocotber 18, 2023 | 2 p.m. Die Kunst der Präzision: Wie Strahlentherapie bewegte Tumore trifft Lennart Volz, GSI/FAIR Registration and further information