50 Jahre GSI

https://www.gsi.de/fileadmin/oeffentlichkeitsarbeit/logos/01_50_Years_GSI_RGB.png

FAIR

Bei GSI entsteht das neue Beschleunigerzentrum FAIR. Erfahren Sie mehr.

https://www.gsi.de/fileadmin/_migrated/pics/FAIR_Logo_rgb.png

GSI ist Mitglied bei

https://www.gsi.de/fileadmin/oeffentlichkeitsarbeit/logos/Helmholtz-Logo_web.png

Gefördert von

BMBFHMWKMWWKTMWWDG

Außenstellen

HI-JenaHIM

Welcome to the UNILAC Post Stripper Upgrade (PSU) Department

https://www.gsi.de/fileadmin/_migrated/pics/unilac.jpg
Universal Linear Accelerator (UNILAC)

In July 2019 the LINAC department has been renamed to "UNILAC post-Stripper Upgrade" department. This step has been triggered by the council decision to replace the existing post-stripper drift tube linac (DTL), being operational since the mid 1970ies, by a completely new section. Replacing the DTL section thus became a top priority task and focus of the department, now being reflected properly through its name.

The post-stripper DTL provides acceleration of the ions after they have been stripped in the gaseous stripper. The DTL is 55 meters long and comprises five accelerating cavities, each of them having a diameter of about two meters and consuming up to two Megawatt of radio-frequency power. Acceleration is from 5% to 15% of the velocoty of light. The new DTL will be based (as the today's one) on cavities of the Alvarez-type in order to provide the high beam quality required by FAIR. The name of the new DTL is ALVAREZ 2.0.

 

Department Head

Dr. Lars Groening


Email: La.Groening(at)gsi.de
Tel: 06159-71-2344
Loc: BR1.2.138

https://www.gsi.de/fileadmin/_migrated/pics/lars_01.png

Department Head (Deputy)

Dr. Sascha Mickat


Email: S.Mickat.(at)gsi.de
Tel: 06159-71-1600
Loc: BR1.2.137

https://www.gsi.de/fileadmin/_migrated/pics/sascha_01.png

News

09-16-2019:  

09-08-2019:

start of rf-measurements at first-of-series cavity section

participation to  International Beam Instrumentation Conference (Malmö, Sweden) on 4D emittance measurement set-up and its transfer to industry

08-06-2019:

successful in-house Cu-plating of drift tube

                                     

 

   

https://www.gsi.de/fileadmin/user_upload/FoS_rfMeas_01.jpg
https://www.gsi.de/fileadmin/user_upload/FoS_DT.jpg