Civil Construction

The FAIR complex will be constructed to the east of the existing GSI facility. The fact that the project will use the existing accelerator as an injector influenced the decision to build the new facility here. The architectural plan also incorporates the need to conform to radiation protection requirements and optimize costs for the buildings and technical facilities. All these considerations have led to the following concept: The large double ring with a circumference of 1,100 meters will be laid out underground in a ring tunnel at a maximum depth of 17 meters. Thus the forest in the region of the double ring can be mostly preserved. All of the other buildings will be arranged south of the large ring tunnel. Due to the large areas involved, an above-ground solution is more economical here. Construction of the above-ground buildings will require clearing of presumably 20 hectares of forest for which compensating measures have already been settled.

Choose your Language:
Deutsche Version
 
 
GSI Helmholtzzentrum für
Schwerionenforschung GmbH
Planckstr. 1
64291 Darmstadt
Tel.: +49-6159-71-0
Email: FAIRgsi.de
Edit this page

If you have any comments/suggestions on this page, please contact webmastergsi.de
Last update: 26. Okt. 2007 by pomplun

GSI Homepage