GSI Helmholtzzentrum für Schwerionenforschung GmbH
   


SIS18 Upgrade


 

Preview

Preview

Preview

Elektrostatic Septum
with Inflector Magnet
(draft)

Electrostatic Septum
after completion
(Foto)

Exchange of all Dipole- and Quadrupole chambers by new, NEG coated chambers




Preview

Preview

Preview

Acceleration Cavities (draft)

h=2Ma

Collimation System (draft)




Preview

Preview

Preview

TK- (Transfer Channel)
Charge State Seperator
(draft)

Ionization-Profile-Monitor (IPM), for beam profile measurements.
The measurement of the beam width allows to drive an accelerator more efficiently.

New Power Supply for GSI

 

 
SIS18 Upgrade EU Construction Program
 
SIS18 Upgrade-Program Schedule
 
Further FAIR arrangements:
Extension of the main Magnet Power Converter
 



Last update: 28. April 2011 by P.Schwab