2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011
SIS18 Site News Group
P. Spiller (Tel.: 2405)J. Stadlmann (Tel.: 1372)
N. Pyka (Tel.: 1398)H. Ramakers (Tel.: 2377)
Elektrostatic Septumwith Inflector Magnet(draft)
Electrostatic Septumafter completion(Foto)
Exchange of all Dipole- and Quadrupole chambers by new, NEG coated chambers
Acceleration Cavities (draft)
h=2Ma
Collimation System (draft)
TK- (Transfer Channel)Charge State Seperator(draft)
Ionization-Profile-Monitor (IPM), for beam profile measurements.The measurement of the beam width allows to drive an accelerator more efficiently.
New Power Supply for GSI