The Synchrotron RF Working Group is responsible for maintenance, operation and optimization of the SIS18 and ESR accelerating cavities, the corresponding RF power amplifiers and supply units and the low-level RF systems.

Projects

In addition to the operation of the SIS18 and ESR cavities, the Synchrotron RF Working Group is responsible for a variety of new projects. Some of these projects are listed in the following:

  • SIS18 Bunch Compressor System
  • Digital RF Control
  • Bunch Phase Timing System BuTiS
  • SIS18 h=2 Cavity for Dual Harmonic Acceleration (EU FP6 Construction Program)
  • Longitudinal Feedback System (EU FP6 Design Program)
  • Fast Semiconductor Gap Switches (EU FP6 Design Program)

 